Case Studies

Go behind the scenes of real case studies where ENG works hand-in-hand with contractors, engineers, and owners to deliver innovative solutions. See how our expertise drives measurable results in every project. 

Case studies

LOD 450 BIM Coordination for an 850,000 sq ft Hospital: A Case Study 

What happens when the BIM model gets too big to open? On this project, LOD 450 meant modeling every conduit, cable tray, hanger, and seismic brace, plus the dense systems packed into each operating room. The file grew so large that the trades couldn’t open or navigate the model in Revit, and the team fell […]

4D BIM Case Study: How ENG Helped to Win a Pursuit 

A pursuit-stage 4D BIM model, built in two to three weeks, helped a general contractor win a competitively procured hospital expansion on an occupied medical campus. The project was pursued through a best-value procurement with multiple stakeholders on the selection committee. ENG built the model as part of the contractor’s pursuit team. The distinction that […]

Galvanic Corrosion at AHU Connections: BIM Coordination Case Study 

In Revit, the connection was valid. In the field, it would have failed.   That failure would not have come from a clash, clearance issue, or modeling error. It would have come from galvanic corrosion in an Air Handling Unit (AHU). Caused by a direct dissimilar-metal connection between copper and stainless steel.  This is where LOD 400 BIM coordination becomes more than geometry verification. In this case, the project BIM team identified a copper-to-stainless steel connection that Revit accepted. Still, the field installation […]

BIM Prefabrication for Mechanical Contractors: How Integrative Workflows Reduced Field Labor by 40%

When a project demands 90,000+ linear feet of grooved pipe installed across five complex buildings in nine months, the margin for error is effectively zero. At this scale, BIM prefabrication stops being a nice-to-have and becomes the execution strategy.   Most mechanical contractors still use BIM to detect clashes and produce drawings. Yet, on complex, fast-track projects, that approach breaks down. BIM must extend into fabrication and field installation, or it creates friction instead of […]

Mechanical BIM Case Study: LOD 400 Coordination for a 160,000 SF Laboratory Warehouse in Indiana 

Delivering LOD 400 Mechanical BIM within an existing, partially developed model can introduce significant coordination risks. ENG was brought in to provide Mechanical BIM services in a 160,000 sf laboratory warehouse model in Indiana.

How BIM Prefabrication Helped MEP Contractors at Penn State Lancaster Medical Center

What does BIM prefabrication really mean for mechanical and plumbing contractors? This case study shows how it delivered 20% faster schedules, 30% labor savings, and safer installations on a major healthcare project. At the Penn State Lancaster Medical Center […]

BIM for Data Center Projects: 4-Steps Strategy for Conduit Prefab Success by ENG

Data centers demand high-performance infrastructure, especially when it comes to coordinating complex electrical systems. These mission-critical facilities often involve strict technical requirements, fixed routing constraints, and the need for speed and precision.[…]

Semiconductor Fab Prefabrication: How ENG Delivered Remote Electrical Prefab Before a Shop or Field Crew Existed

What happens when you’re asked to prefab a semiconductor fab, the most complex manufacturing facility in the world… before there’s a field team—or even a prefab shop?   That’s the challenge ENG faced when partnering on a 2.4 million square foot semiconductor fabrication facility in Arizona — a hyperscale project defined by tight timelines, constant change, […]

How VDC and Robotics Improve Construction Efficiency 

What if tomorrow’s construction solutions could be implemented today? ENG’s latest case study shows how VDC and robotics make this vision a reality. In the recent case study webinar “Tomorrow Happening Today,” ENG partnered with experts from Alston Construction company and Dusty Robotics. Together, they showcase how combining advanced technologies with Virtual Design and Construction […]

Robotic Total Station (RTS) Site Applications

In this video, ENG and Bunkley Electric demonstrate how the integration of Building Information Modeling (BIM) and Robotic Total Station (RTS) technology can improve construction efficiency.

BIM Metal Framing Prefabrication

In this video, The BOLDT Company, supported by ENG, showcases how prefabricating wall framing offers stunning opportunities for construction cost and time savings taking full advantage of Virtual Desing Construction.

GC Taking the BIM Modeling Authoring

This case study highlights ENG’s role as the BIM modeling consultant for the Van Nuys Fire Station No. 39 project, led by Ford E.C., Inc. At ENG, we firmly believe that ownership by the trade contractors of the trade model is critical to the success of the BIM coordination process.

Democratization of BIM technology

Successful BIM Coordination for Small/Mid-Size Trade Contractor For example, Hi-tech and educational owners, as shown in this video with Google and Stanford University, are requiring BIM on all of their projects. Sometimes, small to mid-size electrical, mechanical or plumbing[…]

YouBIM & IBM Maximo Integration

Maine General Hospital The Challenge Integrate YouBIM into the Maximo environment (traditional static directory tree navigation) The world leading solution from IBM, Maximo is one of the most widely deployed CMMS […]

BIM for Fabrication Healthcare Facility

Treasure Coast Behavioral Care Facility The Treasure Coast Behavioral Care Facility is a newly constructed 80 bed facility in the city of Stuart on Florida’s beautiful Treasure Coast. Stokes Mechanical Contractor, Inc. a reputable Contractor from Lake Worth, Florida, […]

Testimonials

Granite Construction Co.

NEW CORPORATE HEADQUARTERS – Cupertino, CA ”Their quick response, quality of service, make ENG our BIM partner of choice.” James M. WeddingProject DirectorGranite Construction Co.

VOA Associates Incorporated

Downtown Disney Expansion, Disney´s Springs – Orlando, FL ” I thank ENG for the job well done and when our modeling needs or requirements exceed what we can do in-house, actually ENG is the first one I would call” … Ted G. Fery, Architect, AIA,[…]

Let’s Talk!

We are here to help. Fill out the form and we’ll get back to you promptly. Or call us at: 888-556-6246


    *Required fields.

    By submitting my personal data, I consent to ENG collecting, processing, and storing my information in accordance with the ENG Privacy Policy