    Case Study: BIM Metal Framing Prefabrication

    BIM Metal Framing Prefabrication | The BOLDT Company

    Prefabricating Wall-Framing brings a stunning opportunity for construction cost and time savings. The BOLDT Company, supported by ENG fabrication modeling capabilities is taking full advantage of Virtual Design Construction.  BOLDT counts on a Pre-Fabrication shop in Appleton, WI, where all the architectural wall components of several Hospitals BOLDT has under construction, are been pre-manufactured with minimal waste and shipped to the site where they are installed in a fraction of the time.  Hard to compete with such efficiency!