Top BIM Company of the Year Learn more >
The dam is 2,651 ft long, has a maximum power output of 3,100 mega-watts (4,200,000 hp), with a record maximum annual power output of 20.091 TWh (72.33 PJ)
Location: Argentina
Client: Confidential
Services Provided:
- As-Built REVIT Modeling of Concrete Structures
- Piping, Equipment and Electrical for Operations purposes
- Implementation of YouBIM Software (BIM for FM) – IBM Maximo Integration
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |