Case Study: Extreme Optimization of Hospital Install Time and Cost with BIM MEP Rack Design. Register now!
Join us as we take you behind the scenes of the Lancaster Medical Center—a $43M mechanical scope project delivered on time and under budget for Penn State Health.
Register and view ON DEMAND
Available since April 29.
Gain insights from industry experts — register now and get instant access as soon as it’s available.
A must-watch for VDC leaders, BIM coordinators, and prefab teams looking to maximize impact on cost, schedule, and safety.
A must-watch for VDC leaders, BIM coordinators, and prefab teams looking to maximize impact on cost, schedule, and safety.
Project Manager at ENG
VDC Manager at McClure
CRO