Case Study | Extreme Optimization of Hospital Install Time & Cost with BIM MEP Rack Design

Join us as we take you behind the scenes of the Lancaster Medical Center—a $43M mechanical scope project delivered on time and under budget for Penn State Health.  

Register and watch it now!

Get instant access to the webinar on-demand.






    In this exclusive webinar, our experts will walk you through:

    The process of identifying repeatable zones for optimized MEP rack deployment.

    A detailed look at the BIM/VDC workflows that powered our prefabrication strategy.

    Real metrics on the impact of schedule, cost, materials, and safety.

    The role of integrated planning in delivering a 341,000 SF, six-story hospital with 129 private beds, full surgical capabilities, and more.

    A must-watch for VDC leaders, BIM coordinators, and prefab teams looking to maximize impact on cost, schedule, and safety.

    Speakers

    German Siegrist

    Project Manager at ENG

    Jay Strausbaugh

    VDC Manager at McClure

    Jay Berryhill

    CRO