Case Study: Extreme Optimization of Hospital Install Time and Cost with BIM MEP Rack Design. Watch it now!
The new facility is occupied by students ranging from Kindergarten through 8th grade. It is located in a congested urban area; therefore, maximizing vertical space (such as using the roof as a playground) is important for full educational functionality.
Location: Illinois - United States
Client: Amber Mechanical
Size: 156,000 sf | 14.493 m2
General Contractor: Turner Construction
Services Provided:
- BIM Modeling of Mechanical Systems
- 3D Coordination
- Installation Drawings for Mechanical Contractor
- On-Site Meeting Attendance to Coordinate with Other Trades