Case Study: Extreme Optimization of Hospital Install Time and Cost with BIM MEP Rack Design. Watch it now!
Location: Argentina - Córdoba
Client: Confidential
Services Provided: - BIM Modeling of all trades - BIM Coordination - As-Built Modeling
New Vai Town Bridge
Yacyretá Hydroelectric Power Plant
Waterwaste Treatment Plant Bajo Grande
Riyadh Metro
© Copyright eng BIM company LLC. All rights reserved 2025.