Case Study: Extreme Optimization of Hospital Install Time and Cost with BIM MEP Rack Design. Watch it now!
The Hydroelectric plant capture the water from the river San Andrés for an installed capacity of approximately 20 MW.
Location: Colombia
Client: Camargo Corrêa
Services Provided:
- BIM Services: REVIT and Civil 3D Modeling
- BIM Coordination
- 4D Construction Sequence
- Quantities take offs