Case Study: Extreme Optimization of Hospital Install Time and Cost with BIM MEP Rack Design. Watch it now!
Location: Texas - United States
Client: Confidential
Services Provided: - 4D Scheduling - Construction Sequencing
Sand Island Wastewater Treatment Plant
Yacyretá Hydroelectric Power Plant
Fourth Bridge over the Panama Canal
Sistema Produtor São Lourenço
© Copyright eng BIM company LLC. All rights reserved 2025.