Case Study: Extreme Optimization of Hospital Install Time and Cost with BIM MEP Rack Design. Watch it now!
The project consisted of installing two flexible terminal jetties in Brazil, used for delivering Liquid Natural Gas (LNG) from tankers to the Floating Storage and Re-vaporization Unit, then connecting to the main gas lines.
Location: Brazil
Client: Veringer / Duro Felguera Industrial Plants
Services Provided:
- 3D Modeling
- Basic Engineering Design Assessment