Case Study: Extreme Optimization of Hospital Install Time and Cost with BIM MEP Rack Design. Watch it now!
Harvard Dunster House is the first of twelve undergraduate houses to be fully renewed under an ambitious, multi-decade program. The River House renovations alone are expected to cost more than USD 1 billion.
Dunster House, constructed in 1930, is one of the earliest of the seven Houses built according to a plan developed by President A. Lawrence Lowell. It currently houses about 315 students.
Location: Massachusetts - United States
Client: Harvard University
Size: 170,000 sf | 15.794 m2
Services Provided:
- Architectural and Structural As-Built BIM Modeling