Case Study: Extreme Optimization of Hospital Install Time and Cost with BIM MEP Rack Design. Watch it now!
This project at the Hunter Army Airfield Barracks Complex, Phase IV consisted of a three-story military facility and was developed for the US Army Corps of Engineers.
Location: Georgia - United States