Case Study: Extreme Optimization of Hospital Install Time and Cost with BIM MEP Rack Design. Watch it now!
Construction is underway on the second phase of the El Monte Gateway project, as shown in this rendering. This phase will include 208 apartments and 25,000 sq. ft. of retail space.
Location: California - United States
Client: Confidential
Size: 378150 sqft.
Services Provided:
- Mechanical modeling