Case Study: Extreme Optimization of Hospital Install Time and Cost with BIM MEP Rack Design. Watch it now!
Location: Indiana - United States
Client: Swisslog
Size: 350,000 sf | 32.516 m2
General Contractor: Pepper Construction
Services Provided:
- BIM Modeling
- 3D Coordination
- Installation Drawings for Pneumatic Tubing Contractor
- Weekly On-Site Meeting Attendance to Coordinate with Other Trades