The project analyzed the structural behavior of the existing metallic industrial building to determine possible structural failures that the plant could experience during the event of a fire. Various fire magnitudes were investigated on different sections of the building.
Location: Argentina - Buenos Aires
Client: Arcor
Size: 258,000 sf | 25.000 m2
Services Provided:
- Structural Survey
- Analysis of Fire Load
- Analysis of Potential Risk of Feasible Accidents on the Metallic Structure
- FEM Modeling of Metallic Structure
- Collapse Mode Determination
- Construction Support
- 3D Coordination