Case Study: Extreme Optimization of Hospital Install Time and Cost with BIM MEP Rack Design. Watch it now!
The expansion project of the Alto Palermo Shopping Center incorporated two stages. The first stage built a higher level for 26 new retail shops. The second stage constructed a 13-story office tower, including three basements that connect to the existing shopping center.
Location: Argentina - Buenos Aires
Client: Confidential
Size: 172,000 sf | 16.003 m2
Services Provided:
- BIM Modeling for Architectural, Structural, MEP, and Fire Protection Disciplines
- 3D Coordination
- Building Conflict Reporting and Clash Detection
- 4D Scheduling / Construction Sequencing