Upcoming Webinar: How to Prefab a FAB. March 20. Register now!
This past February, ENG participated in Advancing Prefabrication 2025 in Phoenix, Arizona. As the premier gathering of prefabrication leaders, the event brought innovators from MEP, general contracting, and manufacturing to explore how prefabrication, Design for Manufacturing and Assembly (DfMA), and lean methodologies reshape project delivery.
ENG welcomed industry professionals at its booth, fostering insightful discussions and gaining valuable perspectives on industry challenges. By actively listening to their needs, our team engaged in meaningful exchanges highlighting obstacles and opportunities in industrialized construction.
A key highlight of the event was the presentation of a case study titled “How to Prefab a Fab… Have You Tried Time Travel?” led by Ant Mulherin, Head of Electrical VDC at ENG, Andres Leon, BIM Engineer at ENG, and Jim Todd, Superintendent at Dynalectric Oregon. Their session explored innovative approaches to prefabrication, showcasing cutting-edge solutions shaping the industry’s future.
If you want to learn more about our prefabrication services, contact us—we’d love to continue the conversation!