Extreme Optimization of Hospital Install Time & Cost with BIM MEP Rack Design

Please enable JavaScript in your browser to complete this form.

Speakers

In this exclusive webinar, our experts will walk you through:

A must-watch for VDC leaders, BIM coordinators, and prefab teams looking to maximize impact on cost, schedule, and safety. 

In this exclusive webinar, our experts will walk you through:

  • The process of identifying repeatable zones for optimized MEP rack deployment 
  •  A detailed look at the BIM/VDC workflows that powered our prefabrication strategy 
  • Real metrics on the impact of schedule, cost, materials, and safety 
  • The role of integrated planning in delivering a 341,000 SF, six-story hospital with 129 private beds, full surgical capabilities, and more 

A must-watch for VDC leaders, BIM coordinators, and prefab teams looking to maximize impact on cost, schedule, and safety. 

Speakers

German Siegrist

Project Manager at ENG

Jay Strausbaugh

VDC Manager at McClure

JAY BERRYHILL
- ENG_ CRO

Jay
Berryhill

CRO