Case Study: Extreme Optimization of Hospital Install Time and Cost with BIM MEP Rack Design. Register now!
Client: LCS Constructors, Inc
Size: 84,000 SF
Services Provided:
Modeling & Coordination: Fire Protection, Framing, and Structural.