The project consisted of installing two flexible terminal jetties in Brazil, used for delivering Liquid Natural Gas (LNG) from tankers to the Floating Storage and Re-vaporization Unit, then connecting to the main gas lines.
Location: Brazil
Client: Veringer / Duro Felguera Industrial Plants
Services Provided:
- 3D Modeling
- Basic Engineering Design Assessment