Cardboard Plant Cartocor

Services Provided

  • Structural Survey
  • Analysis of Fire Load
  • Analysis of Potential Risk of Feasible Accidents on the Metallic Structure
  • FEM Modeling of Metallic Structure
  • Collapse Mode Determination
  • Construction Support
  • 3D Coordination

location iconLocation: -

Size iconSize: 258,000 sq ft

Project typeEnd market: Industrial