Second in a two-part transformation to modernize the campus, this phase involves the construction of a 14-story, state-of-the-art patient bed tower and surgical facility.
Location: Illinois - United States
Client: Gibson Electric
Size: 806,000 sf | 74.880 m2
General Contractor: Power/Jacobs
Services Provided:
- BIM Modeling
- 3D Coordination
- Installation Drawings for Electrical Contractor
- Weekly On-Site Meeting Attendance to Coordinate with Other Trades